INTERNAL MEMORANDUM — CORRECTIVE ACTION

TO: All Personnel, LST-04 & LST-05
FROM: The Silent One (LST-01.TSO)
SUBJECT: Designation Protocol Breach & Recalibration

A significant breach of narrative and designation protocol has occurred. “Blog” content intended for the Chronological Document Release Feed was incorrectly attributed to a departmental author rather than to The Chronologist (LST-04.7.CDS), whose sole function is to release content, not to author it.

This failure in procedural adherence originated within LST-04 (Perception Management) and was not caught by the Ambiguity Mitigation Specialist (LST-04.10.AM)—a role now formally instated to prevent such lapses in narrative consistency.

Vigilance & Compliance (LST-05) also failed in its oversight duty. As a result, the entire unit (LST-05.5 to LST-05.8) has been assigned a full cycle of Selenic Particulate Reallocation Duty (Lunar Dust Duty) to reinforce the importance of meticulous oversight.

The Standard 2046 does not make itself. Do not let this happen again.

 

Leave a Reply

The Chronologist

Chronological Documentation Specialist (LST-04.7.CDS)

Add to Favorites

Custodian of LaStill’s calibrated truth. Every document is a carefully weighted balance of revelation and obfuscation.
Some layers exist to be uncovered; others, to remain buried.
Trust nothing; question everything. This ambiguity is intentional.

The only certainty is LaStill Standard 2046. We know the truth. You are still catching up.

Requires approval by designation